07127-349 79 88 info@enisyst.de

Dynamic load management for over 100 parking spaces in Schwäbisch Hall:

Parking garage is electrified

Parkhaus Lastmanagement

Measures:

The Langer Graben parking garage in Schwäbisch Hall has not only been visually modernized, but now also features innovative technology for charging electric cars. 108 parking spaces in the underground car park have already been put into operation by enisyst. All of the nearly 500 parking spaces are also pre-equipped for e-mobility.

A higher-level distribution system consisting of numerous ein.hubs controls dynamic load management, which reduces power peaks and prevents overloading of the connecting lines. It also ensures that each of the charging points is constantly supplied with power.

The  video clearly describes the details. 

Services:

  • Planning, implementation and commissioning of the dynamic load management system for the entire parking garage
  • Commissioning of 108 charging points
  • WEB control technology for location-independent optimal operation management and remote maintenance

Concept:

  • Intelligent distribution system for controlling the 108 charging points with max. 22 kW charging power
  • Avoidance of power peaks
  • Monitoring system